Factory audit

One-stop service for professional customer factory inspection
Nestle
  • 10 years of service experience
  • Global factory inspection service
  • 5000+ customer cases

As a benchmark enterprise in the global food industry, Nestle is known for its strict audit standards for suppliers. Passing the factory inspection is a key threshold for suppliers to enter their supply chain system, and also an opportunity for enterprises to improve their management level. Th

Service Details

As a benchmark enterprise in the global food industry, Nestle is known for its strict audit standards for suppliers. Passing the factory inspection is a key threshold for suppliers to enter their supply chain system, and also an opportunity for enterprises to improve their management level. This article provides a complete factory inspection guide for suppliers from the perspectives of processes, standards, risks, and response strategies.

1、 Core process of factory inspection

Application and Pre evaluation

Suppliers need to submit applications through Nestle's procurement department or designated institutions and provide basic information such as production capacity and qualification certificates.

Nestle screens suppliers with clear intentions for cooperation through pre evaluation, and those who fail may be directly eliminated.

document preparation

List of required materials:

Company qualifications: Business license, ISO certification (such as FSSC22000SQF, etc.).

Employee rights: labor contract, payroll, social security payment records, work hour attendance sheet.

Environmental documents: Environmental Impact Assessment Report, Pollutant Discharge Permit, Hazardous Waste Treatment Agreement.

Quality System: Raw Material Inspection Records, Production Process Control Documents, Finished Product Inspection Reports.

The documents must be truthful, complete, and consistent with the on-site operations.

on-site audit

Audit institutions: BV, SGS, ITS third-party organizations, the audit cycle is usually 1-3 days.

Key inspection items:

Production management: equipment maintenance records, standardization of process flow, and control of storage temperature and humidity.

Employee rights: whether wages are below the minimum standard, whether overtime is voluntary, and the hygiene conditions of dormitories and canteens.

Safety and environmental protection: effectiveness of fire-fighting facilities, compliance with chemical storage regulations, and data on wastewater and exhaust emissions.

Quality system: Non conforming product handling process, traceability system completeness, customer complaint response mechanism.

Rectification and Review

The audit report will clearly list "serious non conformities" (such as child labor, safety vulnerabilities) and "general non conformities" (such as missing documents).

Suppliers are required to complete rectification within 30-60 days, submit evidence, and apply for re examination. If not approved, the cooperation qualification may be suspended.

Annual supervision and audit

After passing, conduct at least one surprise inspection every year, focusing on the improvement of the previous problem and new risk points.

2、 The three core standards for Nestle factory inspection

Social Responsibility (SMET/SEDEX)

Prohibition of child labor, forced labor, and discrimination; Ensure the health and safety of employees (such as protective equipment, first aid training).

Typical deduction items: failure to provide labor protection equipment, expired first aid kit drugs, and blocked fire exits.

Quality and Food Safety (FSSC22000/HACCP)

Raw material suppliers must have compliance qualifications, and the production process must have CCP (Critical Control Point) monitoring records.

High risk issues: cross contamination, ineffective pest and rodent control, and unmarked allergens.

Environmental Management (ISO14000)

Energy consumption data tracking, carbon reduction plan, waste classification and disposal.

Key points of review: Hazardous waste is handled by unqualified institutions and online monitoring equipment for wastewater is not installed.

3、 Common risks and coping strategies of suppliers

Reason for high-frequency failure

File fraud: There is a contradiction between the salary statement and the employee interview records (such as attendance showing no overtime, but the employee claims to work more than 36 hours per month).

On site vulnerabilities: locked safety exits, chemicals not labeled with MSDS, expired materials found in raw material warehouses.

Cost optimization suggestions

Internal simulation factory inspection: Hiring consultants to investigate problems in advance saves more than 50% of rectification costs compared to formal audits.

Digital management: Use EHS systems to automatically generate environmental data and use ERP to track supply chain compliance.

Dispute Resolution Techniques

When there are objections to the audit conclusion, objective evidence such as video surveillance and electronic logs can be provided for appeal.

If cultural differences lead to misjudgment (such as holiday red envelopes being identified as bribes), a written explanation of the background is required.

4、 Success Case Reference

A domestic dairy company failed its first factory inspection, with the main issues being:

The per capita area of employee dormitories is less than 3 square meters (Nestle requires ≥ 4.5 square meters);

The laboratory testing equipment is not regularly calibrated.

Improvement plan:

Expand dormitories and add air conditioning Wi-Fi;

Introduce third-party calibration agencies and issue equipment verification reports every quarter.

In the final review, it passed with a score of 92 and became a core supplier for Nestle Asia.

Conclusion

Nestle factory inspection is not only an "exam", but also an opportunity for enterprises to upgrade their management system. Suppliers need to take compliance as the bottom line and continuous improvement as the long-term goal in order to establish themselves in the global supply chain competition. It is recommended to start preparation 6-12 months in advance, and if necessary, collaborate with a professional consulting team to systematically reduce risks.

service recommendation
Begin your message
We are always by your side
Denny8189@126.com
WeChat
Tel:+8618823738189
E-mail:Denny8189@126.com
Add:212, No. 58 Nanlian Road, Nanlian Community, Longgang Street, Longgang District, Shenzhen, China
Tel
+8618823738189
WeChat
Message
TOP
  • Home
  • Tel
  • Service
  • TOP
  • Get in touch with us
    Leave us a message and we will respond within 30 minutes
    service hotline
    +8618823738189
    WeChat
    Name
    Company
    Tel*
    E-mail*
    Content
    *Required fields